A house in 1215/SP281768 Caloundra West QLD. It has an approximate value of $445,000. Constructed in 2016, featuring 3 bedrooms and 2 bathrooms.
UNIQUE, AFFORDABLE & STYLISH Want to stop renting and get into your own home sooner? You cannot miss this opportunity!This block is registering soon and only an 15 week build time, you will be moved in before you know it.A 3 bedroom 2 bathroom home that is architecturally designed for comfort. Have the space to live and grow with features including built in robes to all bedrooms, walk in robe and ensuite to master. The perfect outside entertainment area, protected from those hot and rainy days.FEATURES INCLUDE: Main bedroom with walk-in robe and ensuite bathroom Open plan design - everything you need Practical and functional design maximizing use of space Designed to provide natural cross flow ventilation and plenty of light Colorbond fully insulated roof with anticon blanket Remote controlled lock up garage Dishwasher, Cooktop, Oven and extractor Driveway, Fencing Letterbox and Landscaping Carpet to bedrooms and tiled floors to rest of home Watertank Luxury fittings and window furnishings.Bells Reach is a fast-growing community perfectly positioned in Caloundra close to beaches, schools, shopping and everything else you need.Its centrepiece park, amazing adventure playground and caf is the true heart of Bells Reach where all the friendship and fun begins.THE THOMPSON PROCESS Signed build and land EOI returned to TSH Head office along with confirmations of deposits paid A purchase contract for the Land is produced A Construction Contract for the build is produced Contracts are signed and counter signed by the relevant parties Client obtains Finance Approval for the package within 21 days of contract date (longer if required by extension) 5% Build Deposit Issued for payment Client settle on the land 14 days after the latter of finance approval During this time we are obtaining structural drawings, energy efficiency, relevant preconstructions documents in preparation of lodging into council approval Once Client has settled on the land we will have council approval We can generally start out on site within 1-2 weeks. The progress drawdowns will commence on the Construction Contract the balance of 5% will be paid Once the Slab goes down 10% of the construction costs from the loan will be drawn down, so on and so on in gradual drawdowns.Don't miss out, call our friendly sales team today!*images for marketing purposes only